| Lead Time | Made to Order: 2-3 weeks |
|---|---|
| Frame Material | Steel leg frame |
| Stackable | No |
| Assembly required | No |
| Outdoor Use | No |
Lead Time
Made to Order: 2-3 weeks
Frame Material
Steel leg frame
Stackable
No
Assembly required
No
Outdoor Use
No
Product Code:
The Toro Leg system offers a contemporary and sleek design as well as stability and structural integrity in its steel leg frame.
Specification
25mm Thick Top
3600mm long and above is two piece top
| Lead Time | Made to Order: 2-3 weeks |
|---|---|
| Frame Material | Steel leg frame |
| Stackable | No |
| Assembly required | No |
| Outdoor Use | No |